W. 6TH AVE SIDEWALK
FEBRUARY 2023
KENNEWICK, WA
Project consists of installing sidewalk to connect existing sidewalks along W. Canal Dr. from US-395 Interstate overpass to N. Carmichael Dr. Pedestrian ramps will be updated or installed within the project limits to meet ADA compliance. Street lights will be updated with new LED luminaires. There are two (2) alternate options from station 32+00 to 44+00 along Hatfield Park: Option 1 will be to install new sidewalk, curb & gutter, catch basin, and widen the existing roadway, Option 2 will be to install a 10’ concrete sidewalk adjacent to the right-of –way.