top of page
West 6th.jpg

W. 6TH AVE SIDEWALK

FEBRUARY 2023

KENNEWICK, WA

Project consists of installing sidewalk to connect existing sidewalks along W. Canal Dr. from US-395 Interstate overpass to N. Carmichael Dr. Pedestrian ramps will be updated or installed within the project limits to meet ADA compliance. Street lights will be updated with new LED luminaires. There are two (2) alternate options from station 32+00 to 44+00 along Hatfield Park: Option 1 will be to install new sidewalk, curb & gutter, catch basin, and widen the existing roadway, Option 2 will be to install a 10’ concrete sidewalk adjacent to the right-of –way.